-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
I watched them lay it - I generally cross the bridge once or twice a day. In fact I've been watching them repair the decking periodically for the last 10 or 12 years. I still don't see how it could realistically be £3M.
Yes it was poor, but they basically laid a new lightweight surface on top of what was there, they didn't take up the old surface as far as I could see and certainly didn't do anything to the structure underneath (which is wood); put a line of cones down each side; painted some lines and put in some temporary traffic lights (which are largely ignored) at each end. They do have staff at each end, but £3 million quid? Come on.
-
-
-
-
-
I have acquired a new set of bars for my gravel bike that use internal cable routing.
My bike has Shimano hydraulic brakes.
I would like to fit the new bars and use the internal routing.
However, I have never had to do anything like this with hydraulics before - is there a good guide online anywhere? I have had a search but my Google-fu is obviously weak.
-
-
-
Me also. Have been looking out for a couple of quartz GSs and the only options seem to be in Japan.
(FYI duty is only 2% on watches I believe, so the main consideration is VAT)