Many many days of printing and i have my finished multiboard wall ready to go up once the electrician is finished in my workshop tomorrow. Plan is to put it everywhere theres open wall space eventually
I'm using their bolt locking mounts and "permanent" snaps on any load bearing connection to make it as strong as possible. Can also remove each 9x9 tile by unscrewing the bolts on that tile leaving the rest in place so its easy to work with.
Fixed to 12mm ply wall it should be able to hold things no issue.
Gonna take me months to print all the various mounts but with my printer out in the workshop now i'll have power i can run it 24/7
Many many days of printing and i have my finished multiboard wall ready to go up once the electrician is finished in my workshop tomorrow. Plan is to put it everywhere theres open wall space eventually
I'm using their bolt locking mounts and "permanent" snaps on any load bearing connection to make it as strong as possible. Can also remove each 9x9 tile by unscrewing the bolts on that tile leaving the rest in place so its easy to work with.
Fixed to 12mm ply wall it should be able to hold things no issue.
Gonna take me months to print all the various mounts but with my printer out in the workshop now i'll have power i can run it 24/7
1 Attachment