Did you resolve this? If not, I’d suggest speaking to Kevin Winter; as an engineer, he’s well qualified to work through any potential problems such as putting additional holes in tubes. If it’s possible, he’ll be able to do it. Probably a 6+ month wait though.
Did you resolve this? If not, I’d suggest speaking to Kevin Winter; as an engineer, he’s well qualified to work through any potential problems such as putting additional holes in tubes. If it’s possible, he’ll be able to do it. Probably a 6+ month wait though.