I called them today, Pace anticipate the frames arriving on the 25th, because I'm leaving on the 14th they've prioritised mine, which hopefully means it'll go into the box largely built and then arrive with me (well, at Rat Race) on the 7th of August. However, it might arrive at Rat Race unbuilt, if Pace hasn't had the time to build it. We shall see.
As long as Pace gets the frame on schedule I'll be taking the RC295 to Morzine/Les Gets, and then onto Les Arcs.
I called them today, Pace anticipate the frames arriving on the 25th, because I'm leaving on the 14th they've prioritised mine, which hopefully means it'll go into the box largely built and then arrive with me (well, at Rat Race) on the 7th of August. However, it might arrive at Rat Race unbuilt, if Pace hasn't had the time to build it. We shall see.
As long as Pace gets the frame on schedule I'll be taking the RC295 to Morzine/Les Gets, and then onto Les Arcs.