Opted to take the frame to my LBS (if you class 30 mile round trip as local) to have them remove the bottom bracket and check the alignment of rear drop outs.
Hopefully have it back by the time I get back from London next week. Should also have the original brakes by then and once I've confirmed everything fits I can then finalise the colour and get the frame and forks powder coated.
Thinking this thread may turn out to be more of a diary of the build. :-))
Opted to take the frame to my LBS (if you class 30 mile round trip as local) to have them remove the bottom bracket and check the alignment of rear drop outs.
Hopefully have it back by the time I get back from London next week. Should also have the original brakes by then and once I've confirmed everything fits I can then finalise the colour and get the frame and forks powder coated.
Thinking this thread may turn out to be more of a diary of the build. :-))